When planning a construction project in Pickerington, OH, one of the initial and crucial steps is site excavation. This process involves clearing the land, removing debris, and preparing the ground for the foundation. Understanding the cost of construction site excavation can help you budget more effectively and ensure your project starts on the right foot.

Factors Affecting Cost

  • Site Size: Larger sites require more time and equipment, increasing the overall cost.
  • Soil Type: Rocky or clay-heavy soil can be more challenging to excavate, leading to higher expenses.
  • Depth of Excavation: Deeper excavations need more labor and machinery, thus raising the cost.
  • Accessibility: Sites that are difficult to access may require special equipment, adding to the cost.
  • Permits and Regulations: Compliance with local regulations and obtaining necessary permits can incur additional fees.
  • Weather Conditions: Adverse weather can delay the project and increase labor costs.
  • Waste Disposal: Proper disposal of excavated materials is an extra expense that needs to be considered.

Average Costs for Common Tasks and Costs

Task Average Cost (Pickerington, OH)
Basic Site Clearing $1,200 - $2,500
Soil Testing $300 - $800
Standard Excavation (per cubic yard) $50 - $150
Rock Excavation (per cubic yard) $200 - $400
Grading and Leveling $1,000 - $3,000
Foundation Digging $2,500 - $5,000
Trenching $8 - $20 per linear foot
Hauling and Disposal $300 - $1,000